WSP, Newark

WSP, Newark

This was also one of Karl’s first projects with Lindum Group. It was a design and build contract consisting of a steel frame superstructure with a mix of brick and composite panel cladding, curtain walling, along with some unique external features made this very interesting to build.

The internal fit-out was a very high specification: encompassing hardwood and maple skirting, architrave and doors, marble flooring in the reception lobby, and an open spiral staircase which had the reception counter built into it. The finishes on this build were second to none. What made this particularly challenging was that the end user was also the architect AND engineer!

This was delivered on time and under budget. Karl ran this project side by side with another on the same site dealing with two separate client teams and two fairly different builds, which was a challenge, but a very rewarding one.

 
Duration: 39 weeks

Quick facts

Project value:

$1.2M

Client:

WSP Ltd.

Architect / Designer:

WSP Ltd.

Project Start:

Project End: